Product classification
Contact Us
If you have the intention to cooperate, please contact us immediately and we will give you feedback as soon as possible!
E-Lock
Developed for the connection of membranes to concrete in containment processes involving the connection of impermeable membranes to concrete, E-locks are extruded high-density polyethylene (HDPE) strips with an E-shaped cross-section suitable for secure anchoring in concrete.
Classification:
Eco-Material Series and Auxiliary Materials


- Description
-
- Commodity name: E-Lock
Developed for the connection of membranes to concrete in containment processes involving the connection of impermeable membranes to concrete, E-locks are extruded high-density polyethylene (HDPE) strips with an E-shaped cross-section suitable for secure anchoring in concrete.
Developed for the connection of membranes to concrete in containment processes involving the connection of impermeable membranes to concrete, E-locks are extruded high-density polyethylene (HDPE) strips with an E-shaped cross-section suitable for secure anchoring in concrete.
Product Specification
E-Lock 100*40*5mm.
Product Features
Good impermeability
Excellent chemical resistance
Excellent biological resistance
Excellent UV stability
Scope of Application
Environmental protection, sanitation (such as domestic waste landfill, sewage treatment plant, power plant regulating pool, industrial, hospital solid waste treatment plant slope)
Water conservancy engineering (seepage control, reinforcement of reservoir dams, vertical heart wall, slope protection)
Municipal engineering (subway, underground engineering of buildings, lining of sewage pipes)
Gardening (artificial lakes, rivers, cisterns, slopes of golf course reservoirs)
Petrochemical (chemical plants, refineries, gas stations, tanks seepage control, chemical reaction tanks, sedimentation tanks lining)
Mining industry (washing pond, heap leaching pond, ash dump, dissolving pond, sedimentation pond, tailings slope seepage control)
Transportation facilities (highway foundation reinforcement, subway, culvert seepage control)
Installation Instructions
When pouring concrete, a section of groove is reserved at the position of E-type or T-type locking buckle, and then the E-type or T-type locking buckle is set in the groove during the construction of seepage control, and concrete is poured again to form the locking buckle that is fixed on the surface of the building. The laid HDPE geomembrane is connected by extrusion welding and E-type locking.
Key words:
HAO YANG
More products